Traffic restored on Srinagar-Leh highway after 12 days

 - Sakshi Post

Srinagar, Feb 14 (IANS) The Srinagar-Leh highway was restored for traffic on Wednesday after remaining closed for 12 days.

One of the toughest mountain roads of the World, the over 400 km long road passes through the Zojila Pass that connects the cold desert Ladakh UT with J&K and the rest of the country.

After hectic efforts by the men and machinery of the border roads organisation (BRO), the highway has been restored for traffic.

Since the nearly 15 km road stretch from Sonamarg to Gumri passing through snow-bound Zojila Pass remains frozen, motorists have been advised to use tyre chains during travel on this stretch for safety.

Before Ladakh was made a union territory, the Srinagar-Leh highway would remain closed from late November till early May.

A tunnel under the Zojila Pass is being laid presently at an approximate cost of Rs 6,800 crore. This tunnel will make Srinagar-Leh highway an all-weather road.

Disclaimer: This story has not been edited by the Sakshi Post team and is auto-generated from syndicated feed.


Read More:

Advertisement
Top Stories
 - Sakshi Post
March 23, 2025
Walgo Infra CMD Sridhar Rao Gifts Mini Cooper to Son on Grand Birthday Celebration Hyderabad businessman Sridhar Rao, Chairman and Managing Director of Walgo Infra, hosted an extravagant birthday bash for his seven-year-old son, Abisri, at their Jubilee Hills residence on Saturday, March 22, 2025. Marking the special occasion, Sridhar Rao presented his son with a brand-new Mini Cooper, making the event even more memorable. This became a talking point.
Video
Back to Top